Oil Sands Truth: Shut Down the Tar Sands

Tarsands Infrastructure: South/ East [US & Can]

Tarsands Infrastructure: South/ East [US & Can]

Tarsands Infrastructure: South/East [US] is a category that represents the many connecting and supplying pipelines and associated projects that are needed to transport fuels for the production of tar sands bitumen and to move tar sand heavy bitumen to the Lower 48 of the US for refining. This involves some massive new pipeline projects to Illinois, Wisconsin, Oklahoma, Louisiana, California, Pennsylvania, Texas and elsewhere including existing refineries in Ontario and Quebec.

Though the category is labelled "US", the proposed new projects also traverse untouched Canadian territory across Alberta, Saskatchewan and Manitoba. The names of some of the larger ones include The Alberta Clipper Project, The Spearhead Pipeline (expansion) and the Keystone Pipeline, along with other pipelines controlled by TransCanada and Enbridge, as well as Imperial Oil. Despite the massive size and scale of pipeline networks already existing through the continental United States, these pipelines and associated construction would be needed to achieve US and Canadian government goals of reaching 5 million barrels a day of tar sand oil being shipped out of the tar sands "ground zero" of Alberta.

warning: Creating default object from empty value in /var/www/drupal-6.28/modules/taxonomy/taxonomy.pages.inc on line 33.
Tarsands Infrastructure: South/East [US] is a category that represents the many connecting and supplying pipelines and associated projects that are needed to transport fuels for the production of tar sands bitumen and to move tar sand heavy bitumen to the Lower 48 of the US for refining. This involves some massive new pipeline projects to Illinois, Wisconsin, Oklahoma, Louisiana, California, Pennsylvania, Texas and elsewhere including existing refineries in Ontario and Quebec. Though the category is labelled "US", the proposed new projects also traverse untouched Canadian territory across Alberta, Saskatchewan and Manitoba. The names of some of the larger ones include The Alberta Clipper Project, The Spearhead Pipeline (expansion) and the Keystone Pipeline, along with other pipelines controlled by TransCanada and Enbridge, as well as Imperial Oil. Despite the massive size and scale of pipeline networks already existing through the continental United States, these pipelines and associated construction would be needed to achieve US and Canadian government goals of reaching 5 million barrels a day of tar sand oil being shipped out of the tar sands "ground zero" of Alberta.

N Dakota: Federal regulators give favorable preliminary review of Keystone Pipeline

Federal regulators give favorable preliminary review of pipeline...
Sep 5 2007 5:02PM
Associated Press
http://www.kxmb.com/News/159289.asp

GRAFTON, N.D. (AP) The U.S. State Department has given a favorable preliminary review of a pipeline that would pump crude oil from Canada through South Dakota and six other states.

Keystone Pipeline gets Preliminary Nod from US State Department

Oil Pipeline Gets Preliminary Nod
By JAMES MacPHERSON 09.05.07, 5:40 PM ET
http://www.forbes.com/feeds/ap/2007/09/05/ap4086122.html
BISMARCK, N.D. -

The U.S. State Department has given a preliminary nod to a $2 billion pipeline that would transport crude oil from Canada through seven states.

The Keystone pipeline, a project of TransCanada Corp. (nyse: TRP - news - people ) of Calgary, Alberta, is planned to stretch more than 1,800 miles from Hardisty, in east-central Alberta, to refineries in Illinois, with a spur to Oklahoma.

North Dakota: PSC denies request to delay hearing on [Keystone] pipeline for farmers

PSC denies request to delay hearing on pipeline for farmers
Janell Cole, Forum Communications Co.
Published Saturday, September 01, 2007
http://www.in-forum.com/News/articles/176882

BISMARCK – The Public Service Commission has denied a request by Keystone pipeline opponents to delay next week’s hearing on its proposed route.

The commission voted Friday during an emergency meeting to go ahead with Wednesday’s hearing, which Commissioner Kevin Cramer expects to continue into Thursday.

Marathon Oil to Expand Refinery in Detroit for Tar Sands

Marathon plans to expand Detroit refinery
$1-billion project would create more than 900 new jobs
http://www.freep.com/apps/pbcs.dll/article?AID=/20070827/BUSINESS06/7082...
August 27, 2007

By ALEJANDRO BODIPO-MEMBA
FREE PRESS BUSINESS WRITER

Officials at Marathon Petroleum Co.’s refinery in Detroit plan to announce a $1-billion expansion proposal that would boost oil production 15,000 barrels a day by 2010 and add more than 900 jobs to the local economy.

N Dakota: "Proposed [Keystone] crude oil pipeline threatens land, wastes energy"

Proposed crude oil pipeline threatens land, wastes energy
http://www.in-forum.com/articles/index.cfm?id=176522&section=Opinion&for...
By Janie Capp,
Published Wednesday, August 29, 2007
Regarding the proposed 1,830-mile, 30-inch crude oil pipeline coming from Alberta, Canada, across North Dakota, to Illinois and possibly farther.

Keystone Pipeline hearings set in Missouri

Keystone Pipeline hearings set
http://www.stltoday.com/stltoday/news/stories.nsf/stcharles/story/CB3250...
08/30/2007

Public hearings on a draft environmental impact statement for the proposed Keystone Pipeline are planned in St. Charles and Collinsville next week.

Breaks a Danger in Proposed Keystone Pipeline

Breaks a danger in proposed pipeline
http://www.bismarcktribune.com/articles/2007/08/27/news/opinion/letters/...
Aug 27, 2007 - 05:27:25 CDT
By RAMONA KLEIN
Oriska

Canada wants to build a 1,830-mile, 30-inch crude oil pipeline, pumping 435,000 barrels a day or more, across 218 miles of North Dakota. This directly affects about 600 landowners, neighbors and anybody using water in this part of the state.

BP maybe not going to pollute Lake Michigan? Refinery on Hold...

Pollution roadblock may derail BP refinery of oilsands crude
Oil giant unable to strip out enough ammonia from wastewater
Joe Carroll, Bloomberg News //Thursday, August 23
http://www.canada.com/edmontonjournal/news/business/story.html?id=23b91b...

BP Plc hasn't found a way to reduce water pollution that threatens to scuttle a $3.8 billion Indiana refinery expansion, the second-costliest project of its kind in the U.S.

Tar Sands are Running out of Pipelines

As labour shortages are going to take a short while to be dealt with through the importation of "guest workers" on top of already getting Newfoundlanders to fly in weekly while energy throughout the province is already stretched to beyond capacity, the pipeline problem is the third de facto part of an existing physics-based moratorium. With all of these shortages and the US Dep't of Energy screaming for quadrupling tar sands bitumen production, our strategy to block new pipeline construction at the least slows down the entire project.

--M

Oilsands face pipeline space shortage

PWW: Mining black gold, and profits, from northern sands

Mining black gold, and profits, from northern sands
http://www.pww.org/article/articleview/11600/1/387
Imagine for a moment that you’re an American oil executive. You’re pondering the prospects for the next big oil strike overseas — and dreaming of a place where the government is stable and compliant, the royalties are low and the environmental standards minimal.

Syndicate content
Oilsandstruth.org is not associated with any other web site or organization. Please contact us regarding the use of any materials on this site.

Tar Sands Photo Albums by Project

Discussion Points on a Moratorium

User login

Syndicate

Syndicate content