Oil Sands Truth: Shut Down the Tar Sands

Tarsands Infrastructure: South/ East [US & Can]

Tarsands Infrastructure: South/ East [US & Can]

Tarsands Infrastructure: South/East [US] is a category that represents the many connecting and supplying pipelines and associated projects that are needed to transport fuels for the production of tar sands bitumen and to move tar sand heavy bitumen to the Lower 48 of the US for refining. This involves some massive new pipeline projects to Illinois, Wisconsin, Oklahoma, Louisiana, California, Pennsylvania, Texas and elsewhere including existing refineries in Ontario and Quebec.

Though the category is labelled "US", the proposed new projects also traverse untouched Canadian territory across Alberta, Saskatchewan and Manitoba. The names of some of the larger ones include The Alberta Clipper Project, The Spearhead Pipeline (expansion) and the Keystone Pipeline, along with other pipelines controlled by TransCanada and Enbridge, as well as Imperial Oil. Despite the massive size and scale of pipeline networks already existing through the continental United States, these pipelines and associated construction would be needed to achieve US and Canadian government goals of reaching 5 million barrels a day of tar sand oil being shipped out of the tar sands "ground zero" of Alberta.

warning: Creating default object from empty value in /var/www/drupal-6.28/modules/taxonomy/taxonomy.pages.inc on line 33.
Tarsands Infrastructure: South/East [US] is a category that represents the many connecting and supplying pipelines and associated projects that are needed to transport fuels for the production of tar sands bitumen and to move tar sand heavy bitumen to the Lower 48 of the US for refining. This involves some massive new pipeline projects to Illinois, Wisconsin, Oklahoma, Louisiana, California, Pennsylvania, Texas and elsewhere including existing refineries in Ontario and Quebec. Though the category is labelled "US", the proposed new projects also traverse untouched Canadian territory across Alberta, Saskatchewan and Manitoba. The names of some of the larger ones include The Alberta Clipper Project, The Spearhead Pipeline (expansion) and the Keystone Pipeline, along with other pipelines controlled by TransCanada and Enbridge, as well as Imperial Oil. Despite the massive size and scale of pipeline networks already existing through the continental United States, these pipelines and associated construction would be needed to achieve US and Canadian government goals of reaching 5 million barrels a day of tar sand oil being shipped out of the tar sands "ground zero" of Alberta.

Tar Sands to start poisoning Indiana & Lake Michigan?

Oil sands plan said to draw fire
To process heavy Alberta crude, BP wants to dump up to 50% more pollutants into Lake Michigan, angering some - report.
August 23 2007: 10:48 AM EDT

NEW YORK (CNNMoney.com) -- Plans to process a heavy grade of crude oil from oil sands in the Canadian province of Alberta have sparked a nasty battle in the Midwest, where some politicians are angry that the move will increase pollution in the Great Lakes, according to a report Wednesday.

S Dakota: "Some Canadians protest oil pipeline"

Some Canadians protest oil pipeline
They don't want to give up refinery jobs
By Peter Harriman
http://www.argusleader.com/apps/pbcs.dll/article?AID=/20070811/NEWS/7081...
August 11, 2007

In South Dakota, Trans-Canada's Keystone pipeline project is drawing attention for its potential effect on landowners.

But in Alberta, Canada, where the pipeline will draw its proposed 500,000 barrels per day from northern oil sands, people see South Dakota and other states benefitting from their country's labor drain.

CEP takes on bitumen exports

CEP takes on bitumen exports
By CAROL CHRISTIAN
Today staff
Thursday August 09, 2007
http://www.fortmcmurraytoday.com/Local%20News/329822.html

Fearing Canadian jobs going down proposed pipelines to the U.S., the Communications, Energy and Paperworkers Union (CEP) will intervene in upcoming regulatory hearings.
At the heart of the matter is the union’s intent to protect Canadian jobs, fostering development of the Canadian economy instead of watching all the benefits go south of the border, officials say.

S Dakota's Public Utilities Commission Withholding Landowners List During Keystone Hearings

Landowner list in pipeline case sought
By Terry Woster
twoster@argusleader.com
http://www.argusleader.com/apps/pbcs.dll/article?AID=/20070808/NEWS/7080...
Published: August 8, 2007

PIERRE – South Dakota’s Public Utilities Commission will hear arguments later this month on a request to make public the names of landowners with property along the route of a proposed crude-oil pipeline.

"Canadian energy company plans another pipeline in U.S."

Canadian energy company plans another pipeline in U.S.
http://www.cbc.ca/money/story/2007/08/06/pipeline-oil.html
Last Updated: Monday, August 6, 2007
The Canadian Press

TransCanada Corp. is joining with Northwest Natural Gas Company on a proposal to build a natural gas pipeline in Oregon that could cost the companies up to $700 million US.

Ricardo Acuna on Non-Consensus in the Tar Sands Multi-Stakeholder Committee

http://www.straightgoods.ca/ViewFeature7.cfm?REF=410

Oil Sands Committee reports back

It is time for the Stelmach government to pick a side: public or industry.

Dateline: Tuesday, August 07, 2007

by Ricardo Acuna

Last week, the Alberta Government released the much anticipated final report and recommendations of the Oil Sands Multi-Stakeholder Committee — the committee charged with carrying out a broad-based consultation with Albertans and making recommendations on the future of the Alberta tar sands.

Growth and Pipelines Everywhere

Snippets from the Business pages:
1 Enbridge Promises to build Gateway Pipeline without PetroChina & build Alberta Clipper
2 Largest Companies trying to get in on Expansion of Tar Sands
3 CP to further Expand in Tar Sands
4 Husky adding more Refineries
5 Imperial Oil buys huge exploration permit in Arctic /Beaufort Sea

These stories paint a collective picture of development of mock "oil" out of control.

Not enough pipelines for the Tar Pits: National Energy Board

This news article below shows, once again, that taking out the ability to construct pipelines to send oil and and bring gas (x2) in is a viable strategy for the cessation of the tar pits expansion. In other words, our fights against the Keystone, Alberta Clipper and North-Central Corridor, along with the Mackenzie Gas Project and Enbridge Gateway (among so many more!) all slow down the speed of flowing mock crude to a bottleneck pace.

Alberta Clipper pipeline will endanger Canadian jobs: energy workers‘ union

Jul 25, 2007 11:27:00 AM MST
Alberta Clipper pipeline will endanger Canadian jobs: energy workers‘ union (Alberta-Clipper)

http://www.oilweek.com/news.asp?ID=10358

OTTAWA (CP) _ Canada‘s largest union of energy workers has filed for intervener status in National Energy Board hearings into Enbridge Inc.‘s Alberta Clipper oil pipeline project application, aiming to block the export of jobs and raw resources.

Syndicate content
Oilsandstruth.org is not associated with any other web site or organization. Please contact us regarding the use of any materials on this site.

Tar Sands Photo Albums by Project

Discussion Points on a Moratorium

User login

Syndicate

Syndicate content